Ge Frame 6 Gas Turbine Manual
9E.03/9E.04 Gas Turbine (50 Hz) The 9E is a robust, proven platform that delivers high availability, reliability, and durability while lowering the overall cost-per-kilowatt. Operates on fuels with contaminants, natural gas, light and heavy distillate oil, naphtha, crude, residual oil. Are generally applicable to all GE heavy-duty gas turbines; i.e., Frames 3, 5, 6, 7, and 9. Appendix G provides a list of common B/E-, F-, and H-class heavy-duty gas turbines with current and former naming conventions. For purposes of illustration, the GE GT-7E.03 was chosen for most components. The LM2500 marine gas turbine is a simple -cycle, two -shaft, high -performance engine. Derived from GE’s TF39 and CF6 -6 aircraft engines, the LM2500 consists of a gas generator, a power turbine, attached fuel and lube oil pumps, a fuel control. 2 Used GE Frame 9E Gas Turbine Dual Fuel Engines. 2 Used GE Frame 9E Gas Turbine Dual Fuel Engines -GAS TURBINE GENERAL DATA Gas Turbine Model PG9161 Power Output (Generator Terminals MW 116.4 Efficiency (Referred to Generator Terminals)% 33 Rotor Speed RPM 3000 Direction of Rotation (looking From Gene.
Since 2004, PSM has been providing gas turbine solutions for Frame 6B hot gas path buckets, nozzles & shrouds and compressor hardware. Improved durability and lower life cycle cost is achieved using PSM’s component and system level product modeling and data evaluation tools, to identify the issues and failure modes in current Frame 6B OEM gas turbine designs.
PSM manufactures all gas turbine buckets, nozzles and shroud blocks to be compatible with the latest 2085F firing temperature machines – the Engine Model 6571 – and are also backwards compatible. In normal operation the entire Frame 6B hot gas path has a minimum service interval of 24,000 FFH or 900 FS, which can be increased to 32,000 FFH on a unit by unit basis, with consultation from PSM’s experts.
Ge Frame 6 Gas Turbine Service Manual
1st Stage Nozzle
- Equivalent to OEM
- Optional NiCoCrAlY & TBC Coatings
1st Stage Buckets
- Improved Aero blade profile and cooling
2nd Stage Nozzle
- Equivalent to OEM
2nd Stage Buckets
- Scalloped tip shroud for improved creep resistance
- Increased tip shroud contact face area mitigates shingling
3rd Stage Nozzle
- Equivalent to OEM
3rd Stage Buckets
- Increased tip shroud contact face area mitigates shingling
Ge Frame 7fa Gas Turbine
LEC III™: Field proven 3-5ppm NOx
and
LEC-NextGen: Highly durable sub 9ppm NOx
Compatible with 6581B, 7121EA, 9171E and older turbine models either as a drop in replacement to the OEM DLN1.0 or as a conversion from standard diffusion frame systems. The system has proven versatility with over 70 installations globally on GE Frame 6B, 7E/EA, 9E and most recently 4 x 7B units. Originally fielded in 2001, the patented LEC III™ fuel air mixing technology produces consistent sub 5ppm NOx and single digit CO.
Introduced in 2015, the LEC-NextGen has been developed from the original LEC-I and LEC III™ systems in response to the global power generations requirements for increased durability throughout an increased load range, while maintaining sub 9ppm NOx and single digit CO throughout pre-mix operation.
Looking for Brochure Downloads?
Find additional information regarding PSM's Products and Services on our Media page, under the Brochure Downloads section.